Public art in Cedar Rapids, Iowa
Murals, sculpture, and temporary installations — reviewed by the Commission, entered in the public registry, and inspected over the years that follow.
File 01 — Mural Registry
Each mural in the city gets a card: where it is, who made it, what it is made of, and what condition it is in today. The registry is the public record — you get the whole entry, not a summary.
Street address, wall orientation, and surface material — so a conservator knows what they are looking at before they arrive.
Who made the work, who commissioned it, and the credit line that should appear beside the piece.
Notes from each inspection: stable, watch, or act. Paint lifts, grime, and graffiti all get written down.
Commissioned, installed, or under review — the current state of the work, kept up to date.
The registry is public. If you are researching a wall, planning a conservation visit, or writing about a piece, start here and pull the full record.
File 02 — Artist Calls
New calls appear here as sites are confirmed. Each listing states the site, the budget line, and how the review runs.
Walls offered by building owners, checked for surface, sunlight, and scale, then opened to artists.
Permanent and temporary siting on public ground — from a plinth in a park to a season-long loan.
Short-run work that comes down again, with a conservation note filed either way.
File 03 — Grant Guidelines
Grant guidelines are not a leaflet. They are a numbered handbook, and it is read in sequence — one section at a time, the way it was written.
Read it in order.
Sign at the end.
Keep your copy.
What the grant pays for, and what it does not. Start here.
Who may apply, and who has to put a signature on the application.
How the Commission looks at the wall, the ground, or the plinth before anything is approved.
Line by line, including fabrication, installation, and the cost of caring for the work later.
What you file once the work is finished, so it enters the registry properly.
What happens to the piece in the years after, and who is expected to keep an eye on it.
File 04 — Sculpture Tour
The tour gathers the sculpture the Commission has sited across Cedar Rapids into one route you can walk in an afternoon.
File 06 — Apply
If you have a wall, a form, a material, or a plan, the Commission wants it in writing. Read the call, fill in the form, and let the paperwork do its job.