Receiving dock · Greenville, South Carolina
PDF, STEP or IGES — a photo of the part works too. Send the file and we read the drawing.
The queue — 01 / 02 / 03
Every job starts the same way. The drawing lands here, and everything else queues behind it.
PDF, STEP or IGES. A photo of the part is fine if that is what you have. Add quantity, material and finish.
Feasibility, material and tooling are checked against the drawing before anything is quoted.
A quote measured against the print: material, machine time and the inspection the part needs to ship.
The print decides the route. These are the operations it can pull.
One shop, one queue, one number
Attach a print
Tolerance inspection
Every run is checked against the print — not against the run before it.
Datums, tolerances and the stack are read off the drawing before the first cut.
The first part off the machine is measured against the drawing before the run continues.
Critical features are checked while the run is live, so drift is caught on the machine.
Finished parts are verified on the bench and the numbers are recorded against the lot.
Request a quote
PDF, STEP, IGES or a photo of the part. We read the drawing and send back a number.
Include with the fileGreenville, South Carolina — quotes built from the print