The parts you don't look at.
Most problems start below the display tank. Sump, pumps, plumbing, media and skimmer are inspected, cleaned and measured against the system they were built for — then serviced, upgraded or replaced when they stop holding.
Equipment installation is done with the cabinet open and the system running, so the tank never has to come down. Tank setup follows the same sequence, from plumbing and rockwork to first fill and first reading.
- 01 SurveySump, pumps, plumbing, media and skimmer checked against the original design.
- 02 CleanMechanical media, glass, skimmer cup and return lines brought back to spec.
- 03 InstallNew equipment fitted, primed and run in before the cabinet goes back together.
- 04 RecordWhat was found, what was changed, and what to watch before the next visit.