AeroSpan Precision Components Request a quote

Wichita, Kansas · Aerospace components supplier

Index & RFQ desk

Enter a part number.
Leave with a quote.

Machined bushings, flight-control fittings and seals, turned and finished to the print you send — with AS9100 inspection and kitting on the same order.

Index

Stock and made-to-order, in one place.

Five families cover most of what leaves the floor. Send a part number with the drawing revision and we return availability and a quote.

  • 01
    Machined bushings Flanged, plain and shouldered, turned to print.
  • 02
    Flight-control fittings Rod ends, bellcranks and brackets for control runs.
  • 03
    Seals Standard and high-temperature profiles, matched to the gland.
  • 04
    AS9100 inspection First article through final, with the paperwork to match.
  • 05
    Kitting Parts, seals and hardware packed to the bill of material.
Request a quote

Index preview

Part families we run most often.

Availability and lead time are confirmed against the part number and revision you send.

Part family Material / form Index status Quote
Bushing, flanged BSH · FLG · BRZ Bronze · flanged Stock Quote →
Bushing, plain sleeve BSH · SLV · 17-4 17-4 PH · plain Stock Quote →
Fitting, rod end FIT · RDE · 15-5 15-5 PH · rod end Made to order Quote →
Fitting, bellcrank FIT · BLK · 7075 7075-T6 · per print Quote required Quote →
Seal, high-temperature SEL · AS568 · FKM AS568 series · FKM Stock Quote →
Kit, assembly pack KIT · BOM · SER Per bill of material Made to order Quote →

Representative families only. Send the part number and revision for availability and lead time.

Capabilities

What leaves the floor.

Parts move through one bench and one routing sheet. Bushings, fittings and seals are finished, checked and packed before anything is released.

Machined bushings staged on a bench for inspection
01 Turned bushings staged before inspection.

Verification

Checked against the drawing revision

First article, in-process checks and final inspection are recorded, and the records travel with the lot.

Kitting

Packed to the bill of material

Parts, seals and hardware are counted, serialized where the build calls for it, and packed as one kit.

Flight-control fitting measured on a granite surface plate
02 Critical features checked on the plate before release.

Process

From part number to release.

Three steps, and the print is the only thing we quote from.

  1. 01

    Search the index

    Type the part number or pick a family. The index shows what is held and what has to be made.

  2. 02

    Send the print

    Add the drawing, revision and material callout. The quote is built from the print, not from a guess.

  3. 03

    Confirm and release

    Availability, inspection route and paperwork are confirmed before the lot goes to the floor.

RFQ

Send the requirement.

Part number, quantity and certification. Revision, material and finish go in the notes.

Search the index first

Drawings travel by reply to your request.